زيارة مطار كركوك الدولي

 

بتاريخ 28/10/2020 زار فريق استشاري من الجامعة التكنولوجية برئاسة الاستاذ الدكتور صالح العطار مدير مكتب الاستشارات العلمية والهندسية مطار كركوك الدولي جاءت هذه الزيارة بناءا على دعوة وردت من سلطة الطيران المدني لغرض الاطلاع وتحديد حجم الاعمال المنفذة والتي تحتاج الى تدقيق ومصادقة من قبل الفريق الاستشاري

جرى خلال الزيارة اجتماع بين ممثلي سلطة الطيران المدني وممثلي شركة قمم ازمر والفريق الاستشاري كما تم التجول في مرافق المطار للاطلاع على واقع الحال

Achievement of 2015

1-open and operate a field lab to alhifaya project 

2- an engineering consultation, supervision and field lab for alwafaa and alustura housing project in karbalaa

3- audit and design water park project at albayaa district

4- implement test holes, make lab and field tests for used forms 

5- study the environmental impact evaluation of communication towers projects

6- open and operate a field test for training and air development center and air shipping center 

7- Audit the primary designs, BOQ, estimated cost , designed calculation and modify it to construct real estate building in maysan   

 8- operate and supervise a field lab to test the samples of add a lay of pavement for general hospital project of armed forces in baghdad 

9- supervise to reconstruct and rehabilitate the factory of machinery maintenance at baghdad international airport

10- audit designs to abas bin firnas housing complex project

11- provide environmental impact study to communication towers sites

12-evaluate the study to construct a factory to produce a pistols in iraq

13- make a geotechnical test, soil test and electrical resistance test

14- audit the sewage system report , sump pump and purification stations in cities

15- provide consultant services to basmaya project 

16- survey works for services which obstruct potable water pipes 

17- audit the primary designs , BOQ and estimated cost to real estate building in alnajaf 

18- consultant services to reconstruct a bridge in north of baghdad

19- provide consultant services to supervise on rehabilitate and and develop alsuwairah airbase project  

20- open a field lab to implement the construction testts affiliate with project of reconstruct and develop diyala provice

21- consultant to evaluate alkarma hotel

22- provide engineering and reconstruction consultant study and supervise to reconstruct a factory to produce an electronic passport and card

23- modify the designs of general passport building to the ministry of interior

24- make environmental impact study to communication towers sites

25- prepare electrical designs of alkarma hotel

Achievements of 2016

1- Engineering supervision and consultant and field lab to AL-Ustura and AL-wafaa projects in karbalaa.

2- Open and operate a field lab of the project to construct an electric station in AL-Taji

3- Prepare designs and drawings to field lab building 180 m2  , engineers offices building and two residential buildings 

4- Design an excavating sample to the solar lightening  system of aircraft fans

5- audit design of housing al khwa project

6-provide consultant services to housing alakhwa project

7- provide technical consultant to sawa railway project along with 3 bridges 

8- provide consultant services to audit , engineering supervise and approve to construct Jawharat AL-Muhit complex in ALKadimiya

9-provide technical and engineering  consultant to design , supply and install   CCTV project in ALHila and ALmussayb

10- prepare desgin and BOQ for hydrant system of fire - fighting system at electric station in almsayb

11- make soil test to ALzawraa theatre site

12- supervise diyala project building

13- introduce samples of soil compaction to Germany hospital site in ALJadriya

14- implement and design floating dock platform in north of um qasr

15- study the damage and treatment , BOQ, estimated costs to the tunnels of baghdad in ALRisafa side

16-study the damage and treatment , BOQ, estimated costs to the tunnels of baghdad in ALKharkh side 

17- make an environmental impact studies to towers sites belongs to the first party located in baghdad and provinces

18- prepare drawings an BOQ to develop fire-fighting in ALAdle warehouse

19- prepare the environmental impact report to housing ALakhwa complex project in alamirya

20- a project of digging a safety bunker in karbalaa 

Top